Jiangsu, China
Business Type:
Manufacturer/Factory
Number of Employees:
23
Year of Establishment:
2017-05-04
Plant Area:
7500 square meters
Average Lead Time:
Peak season lead time: 1-3 months
Off season lead time: one month
OEM/ODM Service

Liquid Filling Machine, Water Filling Machine, Water Filling Equipent manufacturer / supplier in China, offering Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant, Fully Automatic 2000ml Plastic Water Pet Bottle Blowing Machine Manufacturers, Fg 4 Cavities 6800-7200 PCS/H Automatic Plastic Pet Bottle Blowing Machine Price with SGS Approved and so on.

Diamond Member Since 2020
Audited Supplier
Supplier Homepage Products Filling machine Beverage,Milk and Water,Wine Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant
  • Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant
  • Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant

Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant

Min. Order / Reference FOB Price
1 Piece US $10,000-500,000/ Piece
Port: Shanghai, China
Production Capacity: 100/Year
Payment Terms: L/C, T/T
Condition: New
Customized: Customized
Voltage: Customization
Composition: Filling Machine
Processing Material: Filling Machine Part
Process: Welding Polish etc

You Might Also Like

Loading...

Basic Info.

Model NO.
GH-109
Usage
Liquid
Certificate
SGS
Size of Bottle Can Be Handled
0.25-50L
Automation
Fully Automatic
Trademark
Ganghong
Transport Package
Wooden Case
Specification
12cnm
Origin
China
HS Code
84223090
Product Introduction
This series of equipment is used in PET (polyester) bottled various mineral water, pure water, juice, fruit wine and other non-sparkling beverage production,achieving three functions of washing, filling, sealing.

Main performance parameters

Type

 

Capacity (bottles/hour)

500ml (P/h)

Precise

 Consumption(M/min)

Water consumption  for bottle washing (t/h)

Power

(KW)

Total Power

(KW)

Overall Dimension (LxWxH)mm

  Weight(KG)

XGF14-12-5

4000

±2%

0.25

1

1.5

2.5

2100X1640X2650

2000

XGF-16-16-5

6000

±2%

0.3

1.6

2.2

3.4

2450X1850X2700

3000

XGF24-24-6

10000

±2%

0.4

2.4

3

4.2

3100X2350X2700

5000

XGF32-32-8

12000

±2%

0.5

3.5

4

5.2

3850X2850X2750

6500

XGF40-40-12

14000

±2%

0.6

4

5.5

6.4

4200X3500X2750

8500

XGF50-50-18

18000

±2%

0.7

4.5

7.5

8.6

4850X3800X2750

12000  

 
Detailed Images
Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant

 
Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant
 

Rinsing Parts

Except the down framework, the transmission parts and some parts that must be made of special materials. Other spare parts are made of stainless steel 304. 

The gripper is made of stainless steel, the position where hold the bottleneck is also made of stainless steel, compared with the traditional rubber gripper, it is much hygiene, durable, and no quick-wear parts, the screw parts of the bottleneck can avoid being polluted by the rubber gripper. 

Filling parts

The pressure mechanical valve is introduced the advanced foreign design with a fast filling speed, no hygiene corner pocket, a few sealing parts, and precise liquid level control. The whole valve is made of 304 stainless steel.

Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant
 


Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant
 

Capping Parts

The capping machine can cap different kinds of bottles, it is reliable, easy to operate and easy to maintain. It are widely used in wines, food, drinks, medicine, chemicals, reagents, pesticides and automatic packing etc. It is the most popular rotary screw automatic folding capper.

Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant

Company facilitate
Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant
 

Packing & Delivery

Packaging Details: Standard export packing suitable for long distance land and sea transportation.

Shipping Detail: Shipped in 45 working days after advance payment and sample bottles and capers received.

Loading Port: Shanghai, Ningbo,Shenzhen

Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant

Our Advantage:

No matter whether you're a newcomer or a sectoral expert - we have the specialists who can provide the comprehensively can-do support you need for planning a new facility in terms of not only actual beverage production, but also filling, packaging, utilities and logistics. In closely responsive consultation with you, from a multiplicity of possible options, we select the technologically and commercially most effective variant, handle the design and planning work, and bring the project to a successful conclusion at your chosen location. Sunswell is not only the consultant here, but also takes responsibility for executing the entire project.


Perfect Water Production Line, Small Scale Bottle Water Filling Machine, Mineral Water Filling Producing Plant
 

FAQ

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, 

please call us or tell us in your email so that we will regard your inquiry priority.

 

2) Are you factory or trading company?

We are factory and manufacture.
 

3) Where is your factory located? How can I visit your factory?

We are located in Wuxi, you can fly to Changzhou airport or Wuxi airport. We can pick you up from the airport or your hotel.

Welcome to visit us!
 

4) How to place my order?

Just contact us via Trader Manager, E-mail, Skype or telephone to confirm the product, make the deposit then we will start to manufacture.
 

5) What about the transportation and delivery date?

Normally we use shipment to transport the goods.It is about 25-40 days.It also depends on which country and port you are.

It could be shorter if you need to send the goods like Asian.

If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
 

6) The After-sales Service of Ganghong Machine 

1. After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools

2.After the commissioning, we will package the equipment by standard export package for shipment.

3.According to the customer's request, we can arrange our engineers to customers' factory to do the installation and training.

4.Engineers, sales managers and after-sales service manager will form a after-sales team, online and off line, to follow the customers' project.

 

Send your message to this supplier

*From:
*To:
avatar Mr. Ruqing Liu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now